Search results

1 – 10 of 151
Article
Publication date: 1 March 2011

Toru Eguchi, Robert Schmidt, Andrew Dainty, Simon Austin and Alistair Gibb

This paper explores the adaptability of buildings in Japan from the perspective of three distinct practice typologies: large general contractors, large architectural design firms…

Abstract

This paper explores the adaptability of buildings in Japan from the perspective of three distinct practice typologies: large general contractors, large architectural design firms, and small design ateliers. The paper illustrates the cultivation of adaptability in Japan revealing a maturing of concepts into current innovations, trends, priorities, and obstacles in relation to adaptability in design. The paper contextualizes the situation by reviewing the evolution of residential development in support of building adaptability, and the ways in which these policies and concepts have shaped practice and transcended residential design. This evolution is then explored through non-residential case studies undertaken by the three practice types, and supported through a review of critical themes emerging from the interviews. The importance of particular physical characteristics are examined including storey height, location of services, planning modules and structural spacing/spans. The interviews expose the critical relationship between adaptability and different social variables - the state of the market, the role of planning regulations and other legal frameworks; as well as, the misconceptions and variations in the perceptions on the role and meaning adaptability has in practice. The paper is concluded by revealing the lessons learnt, including the unfolding of dependencies outside the ‘black box’ of adaptability (e.g. practice culture, material and, stakeholder mindsets) and the requirement of effective communication of concepts to allow an informed conversation between professionals and with clients and users. Like many other philosophical design concepts in complex processes, adaptability benefits from a mutual understanding, good relationships, communication, integration, and shared goals amongst team members.

Details

Open House International, vol. 36 no. 1
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 2 May 2019

Enoch Sackey, Martin Tuuli and Andrew Dainty

The evolving roles of BIM and smart building technologies in the design and management of construction projects often present unexpected events and variabilities, which tend to…

Abstract

Purpose

The evolving roles of BIM and smart building technologies in the design and management of construction projects often present unexpected events and variabilities, which tend to erode professionals’ prior knowledge authority. The purpose of this paper is to explore how construction organisations can deploy knowledge and adapt to the requisite skills in order to make fitting responses to the ever-evolving technological and organisational transformations to address the prevailing construction challenges.

Design/methodology/approach

The paper opted for an abductive research approach that ensures back-and-forth iterative dialogue between the empirical data and an amalgam of the theoretical proposition towards new understanding of the phenomenon under investigation. A multiple case study method was adopted to collate the empirical data from three separate construction organisations as they transitioned into BIM compliant work processes.

Findings

The study has described new processes that not only mediate existing practices but focus on consistently resolving known tensions and contradictions between prior knowledge and the requirement of the changing work situation. The study also illustrates the cognitive synchronisation of the learning approaches within contemporary work organisations that align well with the merits and utilities entrenched within their niche technological choices.

Research limitations/implications

Due to the chosen research methodology, it is acknowledged that future comparative studies using a much larger quantitative data sample to further elucidate the findings of this paper would be an interesting further step.

Originality/value

The study contributes to construction management literature by providing new insights into expansive learning environments capable of addressing cognitive contradictions and ambiguities inherent in the changing contemporary work patterns in the construction context as a consequence of BIM deployment.

Details

Built Environment Project and Asset Management, vol. 9 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 2 August 2018

Ksenia Chmutina, Peter Fussey, Andrew Dainty and Lee Bosher

A number of severe weather events have influenced a shift in UK policy concerning how climate-induced hazards are managed. Whist this shift has encouraged improvements in…

Abstract

Purpose

A number of severe weather events have influenced a shift in UK policy concerning how climate-induced hazards are managed. Whist this shift has encouraged improvements in emergency management and preparedness, the risk of climate change is increasingly becoming securitised within policy discourses, and enmeshed with broader agendas traditionally associated with human-induced threats. Climate change is seen as a security risk because it can impede development of a nation. The purpose of this paper is to explore the evolution of the securitisation of climate change, and interrogates how such framings influence a range of conceptual and policy focused approaches towards both security and climate change.

Design/methodology/approach

Drawing upon the UK context, the paper uses a novel methodological approach combining critical discourse analysis and focus groups with security experts and policymakers.

Findings

The resulting policy landscape appears inexorably skewed towards short-term decision cycles that do little to mitigate longer-term threats to the nation’s assets. Whilst a prominent political action on a global level is required in order to mitigate the root causes (i.e. GHG emissions), national level efforts focus on adaptation (preparedness to the impacts of climate-induced hazards), and are forming part of the security agenda.

Originality/value

These issues are not restricted to the UK: understanding the role of security and its relationship to climate change becomes more pressing and urgent, as it informs the consequences of securitising climate change risks for development-disaster risk system.

Details

Disaster Prevention and Management: An International Journal, vol. 27 no. 5
Type: Research Article
ISSN: 0965-3562

Keywords

Open Access
Article
Publication date: 3 April 2018

Eloise Grove, Andrew Dainty, Derek Thomson and Tony Thorpe

The intra-organisational relationships of through-life support services providers are complex, especially given the multifaceted nature of the provision required. For example…

3241

Abstract

Purpose

The intra-organisational relationships of through-life support services providers are complex, especially given the multifaceted nature of the provision required. For example, capabilities within the UK highways maintenance arena must support engineering design, routine maintenance and the on-going management of the network. While collaboration in construction projects has formed a major research focus in recent years, there is a paucity of work examining collaboration in-flight.

Design/methodology/approach

Through a micro-practices approach, two contracts delivering highway infrastructure maintenance and renewal services are examined to explore the intra-organisational relationships that determine the quality of service delivered.

Findings

Despite the rhetoric of collaboration and integrated working that pervades the contemporary project discourse, there was a clear focus on addressing immediate technical and commercial concerns, rather than on creating the conditions for integrated working to flourish. On the occasions where the collaborative environment was prioritised, a more integrated service was delivered.

Originality/value

In contrast to other accounts of the ways collaborative working shapes performance, this research reveals an acute need for a sustained collaborative effort; as soon as “collaborative working” was normalised, the level of integration and seamlessness of service was diminished. This questions normative notions of what defines collaborative working in projects and suggests a need for re-framing it as an on-going accomplishment of actors involved. Such a perspective resonates with notions of “organizational becoming”, particularly in that attempts to foster collaboration are themselves constitutive of the unfolding and shifting nature of intra-organisational relationships that emerge in complex contractual arrangements.

Details

Journal of Financial Management of Property and Construction, vol. 23 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 21 February 2022

Elisabeth C. Marlow, Ksenia Chmutina and Andrew Dainty

Conceptual interpretations of sustainability and resilience are widening with discursive use and altering the relationship and understanding of both concepts. By using three city…

Abstract

Purpose

Conceptual interpretations of sustainability and resilience are widening with discursive use and altering the relationship and understanding of both concepts. By using three city case studies in the USA, this paper aims to consider which conceptual interpretations are operational and what is being measured in the context of city policy, municipal planning and built environment practice. With increasing pressures of urbanisation, it is imperative to consider which conceptual interpretations of resilience and sustainability are being measured in frameworks for the built environment if Risk-Informed Sustainable Development across multiple sectors is to be delivered.

Design/methodology/approach

Three case studies with semi-structured interviews have been thematically analysed to explore how sustainability and resilience have been operationalised at policy, planning and practice levels.

Findings

City policies, municipal planning and practitioners are working with different interpretations. Collectively Risk Informed Sustainable Development is not formally recognised. Policies recognise GHG reductions and natural hazard events; planning guidance stipulates Environmental Impact Assessments based on legal requirements; and practitioners consider passive-survivability and systematic thinking. Across the sectors, the Leadership in Environmental and Energy Assessment Method provides a common foundation but is used with varying requirements.

Practical implications

Decision-makers should incorporate risk-informed sustainable development, update codes of practice and legal requirements leading to exemplary practice becoming normalised.

Social implications

Passive-survivability should be affordable and adopt risk-informed sustainable development principles.

Originality/value

Three US city case studies with data collected from interviews have been analysed simultaneously at policy, planning and practice levels. Interrelated implications have been outlined on how to improve decision-making of sustainability and resilience across sectors.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 14 no. 3
Type: Research Article
ISSN: 1759-5908

Keywords

Article
Publication date: 1 November 2002

David R. Moore, Mei‐I Cheng and Andrew R.J. Dainty

A number of confusions within the area of performance assessment with regard to the use of terminology, and differing interpretations, regarding competence assessment are…

8825

Abstract

A number of confusions within the area of performance assessment with regard to the use of terminology, and differing interpretations, regarding competence assessment are discussed. A significant difference between the US and UK approaches to performance assessment is identified as being the issue of behaviours. A hierarchy of terms and their specific meanings is proposed as a first step in addressing the identified confusions. A particular aspect of this hierarchy is its relevance to assessment based on behaviours and attitudes rather than simply on the results of functional analysis concerning a particular job. This has implications for the future direction of performance assessment in the UK, particularly with regard to identifying the differences between average and superior performance.

Details

Work Study, vol. 51 no. 6
Type: Research Article
ISSN: 0043-8022

Keywords

Content available
Article
Publication date: 9 March 2010

Fiona Lettice and Martin McCracken

649

Abstract

Details

Team Performance Management: An International Journal, vol. 16 no. 1/2
Type: Research Article
ISSN: 1352-7592

Article
Publication date: 1 March 2010

Ahmed Doko Ibrahim, Andrew Price, Malik M. A. Khalfan and Andrew Dainty

In the UK healthcare sector, funding and provision of public care facilities has been primarily the responsibility of government through the National Health Service (NHS). After…

Abstract

In the UK healthcare sector, funding and provision of public care facilities has been primarily the responsibility of government through the National Health Service (NHS). After decades of under-investment and consequent effects on the quality of care, new procurement routes are currently being used to improve the standards of facilities to meet the requirements of modern care services. This paper critically reviews these new procurement routes in terms of concepts and suitable areas of application, and examines how the principal procurement methods have evolved into the forms used for UK healthcare facilities. The paper outlines recommendations for further research in assessing the suitability or otherwise of these new procurement methods, both for construction projects generally and specifically for healthcare facilities.

Details

Journal of Public Procurement, vol. 10 no. 1
Type: Research Article
ISSN: 1535-0118

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The model and existing practice of the construction supply chain (CSC) in the United Kingdom (UK) and Australia was presented in this chapter. The policies and reports that…

Abstract

The model and existing practice of the construction supply chain (CSC) in the United Kingdom (UK) and Australia was presented in this chapter. The policies and reports that support the practice of the CSC were examined in both countries. It was discovered from the review of literature that the UK has a more detailed report targeted at improving the CSC than Australia. However, both countries have a common factor affecting their CSC which originates from fragmentation experienced within their supply chain. Construction stakeholders in the UK and Australia believe that collaboration and integration are vital components for improving performance. The majority of the contractors in both countries embrace collaborative working for the sole purpose of risk sharing, access to innovation and response to market efficiency. However, most of the models developed for managing the CSC in the UK are built around building information modelling (BIM). Also, the reviewed studies show that supply chain management practice will be effective following the following principle: shared objectives, trust, reduction in a blame culture, joint working, enhanced communication and information-sharing. Finally, the UK has a more established framework and more CSC models compared to Australia.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Article
Publication date: 1 August 2005

Kay Greasley, Alan Bryman, Andrew Dainty, Andrew Price, Robby Soetanto and Nicola King

This study aims to examine how empowerment is perceived by individuals employed on construction projects. In contrast with previous research which has predominantly been conducted…

23023

Abstract

Purpose

This study aims to examine how empowerment is perceived by individuals employed on construction projects. In contrast with previous research which has predominantly been conducted from a management perspective, this paper deals with employee perceptions of empowerment.

Design/methodology/approach

A qualitative approach was adopted for this study employing in‐depth interviews on four major construction projects.

Findings

The findings from the study indicate that there can be a gap between the employee experience and the management rhetoric. Health and Safety issues were often cited by the employees as a major barrier to empowerment. The strict Health and Safety regulations under which construction employees operate limit their freedom to influence the work that they undertake. A further factor that was found to have a strong influence on the diffusion of empowerment was the role of the employees’ immediate supervisor.

Research limitations/implications

The data are based on case studies that illuminate our understanding of empowerment in relation to construction projects. This area of research would benefit from alternative research approaches that could establish the generalizability of the findings reported.

Originality/value

This article explores the notion that, as empowerment is a perception, management cannot easily regulate employees’ empowerment. This emphasises the importance of exploring employee perspectives when examining employee empowerment and its impact on workplace relations.

Details

Employee Relations, vol. 27 no. 4
Type: Research Article
ISSN: 0142-5455

Keywords

1 – 10 of 151